This means the outside faces of the line posts will be about 1 4 inside of the line stretched between ihe outside of the terminal posts.
Chain link fence line post depth.
2 above the height of the fence.
Make sure the mark you made earlier is at ground level.
Commercial fence installation tips.
In general for residential chain link fences dig holes 6 in diameter by 30 deep or below frost line in your area.
3 below the height of the fence.
If your fabric is to rest on top of grade this is the industry standard for setting chain link fence posts.
Line post spacing chart.
11 gauge wire is usually only used for temporary construction fence.
Line posts should not be spaced more than 10 feet apart.
This post is used for a 4 ft.
For a site location with a high wind condition and the design selection of an appropriate footing size and depth.
Despite what some people believe making a long lasting fence is not always as simple as sinking a post in the ground and moving on to the next post.
Most commercial chain link fencing has top rail to help prevent bending of wire tops.
Chain link fabric height 2 depth of post in ground total post height.
Add to favorites reading time.
Correct post hole shape.
The line post holes should be lined up so that when they are set in the center of their holes their centers will line up with the terniinal post cbnters.
Add gravel to the bottom of the post hole for drainage.
Select a line post size its spacing and footing for a 12 high chain link fence that will consist of a 9 gage 1 3 4 mesh fabric.
For example if the length between two terminal posts is 30 feet then line posts would be spaced 10 feet apart see chart below.
Terminal posts should be 24 in.
High chain link fence.
For commercial purposes 9ga wire is common on chain link fence although when security is an issue some prefer 6ga because it is harder to cut.
Step 1 depending on the geographical location fence height and fencing materials used post hole size may vary.
The string should be 4 below the top of the terminal posts.
Consider using top rail.
Set the line post in place against the layout line adjust it for plumb and temporarily support it in place with braces.